感謝神! 新堂已破土動工。
昨日空中那片云,停留在我们新堂址上空!悄悄地,不早不迟,
挡住我们头上火热的太阳!不禁使我想起,当年以色列人迈向江南应许之地时,那云柱火柱的指引,竟然是那样的真实和奇妙。昨日,又好像再现在我们面前。
人若立志遵著神的旨意行,就必曉得我们的神是信实的,那云柱火柱必定带领我们,一路前行。
与弟兄姊妹共勉!甚愿神祝福你们!
竑竣
(一)
若非耶和華建造房屋 ,
建造的人就枉然勞力。
若非耶和華看守城池,
看守的人就枉然儆醒。
我行若非神所悅,
一切將拆毀。
我做若無神賜福,
一切都將枉然。
|
(二)
若非耶和華建造房屋 ,
建造的人就枉然勞力。
若非耶和華看守城池,
看守的人就枉然儆醒。
我所需持守的,
只是一顆心。
一顆完全相信的,
堅定倚靠的心。
|
2/28/2010
Trees, Be Gone!
After
six weeks of reviewing, County’s Building Division has replied with the
official comments for our building permit application on November 2,
2009. Since then, the
Building Committee has worked diligently to address all issues with
Architect and Engineering firms.
Our plan is to re-submit every missing item and address all
comments to obtain the building permit without additional delays.
One required item is the Soil Investigation Report (a report that
summarizes the soil contents underground at the location of the
building). To obtain the
report, first we need to remove the trees on the church site.
Yes, we have LOTS of trees!
In fact, it is a jungle!
To
commemorate the first work at our church site (removal of trees), 32
brothers, sisters and children arrived at the site after the service on
January 31. We opened the
gate and entered into the jungle.
Eyes followed tree trunks to heaven, only seeing shadows of great
pines. Giant palm trees
stood closely and hid the paths of our destination.
We had to stoop lowly to move forward, constantly branches
hindered our steps.
Fortunately several brothers who came in before to label trees knew the
way to an open area. We came
to praise our God for his guidance to this milestone.
Adults
stood in a circle ready to pray.
(Fascinated by trees and imaginations, children were at play.)
Brother Yao opened with Isaiah 44:21-28 (“…Burst into song, you
mountains, you forests and all your trees…”).
Then, Rev. Schwartz opened the prayer with “Glory, Glory to the
Father. Glory, Glory to the
Son. Glory, Glory to the
Spirit. Glory to the Three
in One.” Rev. Hsu followed
with thanksgiving and praises to our Lord who has guided us from the
selection of the site, purchase, site plan approval and until now.
We continue to trust Him in the future activities to a building
open for worship.
After
the prayers, everyone clapped and sang “This Is the Day That the Lord
Has Made.” Children brought
with a song they knew “God Is So Good”.
Indeed He is!
Updates as of 1/12/2008
Since our site plan was approved on July, 11, 2007, we have spent
considerable efforts finalizing the details of the floor plan,
proceeding towards the drawing of a set of construction documents and
engineering plans required for building permit application.
1. Discussions (and decisions) were made regarding impact windows
(fixed), A/C system (eight-zoned, with eight A/C units spread around the
building for energy efficiency), generator (portable), floor options in
the lobby foyer (carpet with 7 feet of tiles near the entrance), ceiling
ties (one size, 2x2) and ceiling light plan (dimmable, incandescent and
fluorescent).
2. The kitchen crew surveyed different types of fuels for the kitchen
and found propane continues to be the most economical and efficient.
3. The sanctuary crew solicited proposals from a few pew companies,
and the subsequent pew layout led to the redesign of the platform with 4
steps wrapping around it.
4. A contract was signed with TAVS Audio, Inc. for the design of the
church audio system.
5. Another contract was signed with Jon Schmidt, Inc. for
Landscape/Mitigation & Irrigation.
6. Architect Steve Brock finished the electrical drawings, which,
together with the audio design, are consolidated into the master
architectural drawings.
7. In mid August, a team of brothers braved a swamp of bees to
complete a final count of native trees we need to cut down and buy out.
We then met with the Environmental Resource Management (ERM) to explore
other options of tree mitigation, for a buy-out can be quite expensive.
As a result, ERM identified a piece of land for us to plant seedlings of
trees to replenish for the native trees we will cut down in our lot. We
will apply for a standard vegetation clearing permit as soon as we apply
for a building permit.
Updates as of 5/17/2008
Application for building permits has been postponed till the current
roadblock of rising building material cost is resolved. The building
committee have had:
1. Meeting with the general contractor to list possible cost
reduction items and alternative designs, and bare minimum list required
by the County building office to ensure certificate of occupancy.
2. Meeting with the Water Utility Official to explore ways to reduce
the cost of connecting the sewer and water hookups to the mains on the
south side of Lantana Road.
At issue also is the placement of additional a/c condensers around
the church building to divide the building into several air conditioning
zones. This requires a modification of the site plan and the approval of
the Environment Management Resource as the condensers may intrude into
the Preserve Area.
We see June-July as two months of intense negotiations with
government officials, consultant professionals, general contractor and
architect, cost adjustments and plan modifications so that the project
can move forward toward building permit submittal.
Updates as of 5/3/2009 Since the summer of 2008, the Board and the
Building Committee have worked incessantly trying to bring down the
cost. We were partially successful, having eliminated a number of costly
items such as a full commercial kitchen, movable partitions between
classrooms, electric fans, etc. and decided on alternative fixtures, and
a much cheaper landscape contractor. Then we appealed to the Water
Utility Department and gained approval on our proposed "Jack and Bore"
method of getting water and sewer connections from the south side of
Lantana Road, instead of cutting across the road itself. Environmental
Resource Management finally agreed to our placement of air condition
condensers in the preserved area without penalty. Meanwhile, all the
drawings were revised to reflect these changes and the newly adopted
2007 Building Code. Therefore, it is not without good reasons that the
project has been delayed for one whole year! We are confident though
that by early fall, we can verily apply for the master building permit.
Groundbreaking is still insight by the end of this year, and the
projected completion date is toward the end of 2010. All these we
could not have achieved without the Lord's blessings and the concerted
efforts of our brothers and sisters. Still, the total budget, which
includes such indispensable items as impact fees, median beautification,
left turn lane construction, church signs and furniture, etc. etc.,
remains at $2.9M. After much deliberation, the Building Committee and
the Deacon Board decided to take advantage of the distressed building
industry and opted for competitive bids from other general contractors.
That is, we have essentially terminated our design-build partnership
with Clark Construction and are seeking other general contractors
(without excluding Clark Construction should they come in again with a
low enough bid) to pick up the building project at today's competitive
price. We spent a good part of May, 2009 interviewing prospective GCs
and finally arrived at a short list of GCs for the bidding process.
Please pray for: 1. Continued vigilance, wisdom and unity of our
building committee; 2. A fair and uneventful bidding process that
leads the right GC to us; 3. God's presence in all the business
meetings. |